Saturday, May 30, 2009

Taps Solution


Like I said before the picture above which is displayed in the Home Option Gallery was what we thought we'd be getting but instead our taps were installed too low. I don't think they should display this photo in the Home Option if the end product does not look like this. Not happy about this at all as we had to buy new spouts so that we can use the basins. We opted for the Fluid Plus bath spout as these were shorter and went up slightly and they matched the existing taps. Hope this works. We didn't really need more unbudgetted expenditure.

At no time during the build were we asked to specify how high we wanted the taps. I thought I would have sounded too pedantic if I specified the height of the taps when we were choosing all our fixtures but in hindsight I guess this would not have resulted in what we have now. I did inquire about this at the start of the build when the plumbing went in and was told by my SS not to worry as they knew what they were doing, it will all be sorted out...gullible me believed him. I should have put this in writing then....

I should have gone with a mixer which was my first option but instead I went with the 'standard' taps. My bad, I should have gone with my instinct. I think the taps were the only thing I didn't change. lol.

Speaking of the Home Option Gallery - they have a frameless shower screen there too and there's no hob to be seen in site - my SS should visit this Gallery so he can see what a 'frameless' screen looks like.

How do I get over this? I'm just totally gutted about these mistakes. I guess I had high expectations and EB just hasn't delivered.

Thursday, May 28, 2009

Cleaners

My house is looking very shiny from the outside, the cleaners did an amazing job with the windows. I should have asked them how they cleaned it. What a transformation. So tomorrow the painters are coming back to do the touch ups, and paint the outside - the pergola, cladding, downpipes (I hope).

I've decided to get curtains for the sliding door in the main bedroom, I thought it would be better insulation than the roller blinds I had planned plus I really love sheer curtains; so I can have a block out and sheer also. Now what colour??? I'll be meeting the curtain people on site tomorrow whilst the painters are there.

Tuesday, May 26, 2009

There's no end to what people will pinch, I thought the plumbers were done and dusted but what do I find today when I looked at the kitchen sink - two black holes...I think someone has taken this - the dual multi-link space saver waste fitting in satin finish. We ordered a riva double undermount sink. I saw the plumber fitting this. The taps are in lets just hope no one turns them on.


I wasn't going to say anything about this but this must be the same person that has taken the dish drainer that goes with this sink. We got the box but just not the drainer....this happened ages ago when the benchtop came. I know that this drainer was ordered because the person from HOGallery told us so....and I saw it myself with my own eyes - anyway no problem I didn't want to cause a fuss about a dish drainer and I just ordered one from Cooks plumbing - but someone taking the waste fitting - I just bloody hope EB replace it with the same one.

I couldn't see any plumbing for the dishwasher also - will talk to my SS tomorrow. They've got the box for the dishwasher but no holes to put the plumbing or the plug to go through as these are under the sink. Not really happy with the state of the kitchen either - the doors don't close properly in the sink after the detergent caddy has been fitted in and there are a LOT of scratches and bumps already - does not look like a new kitchen.

The painters must have a day job and just come around to our place after hours - someone came late yesterday afternoon - 5ish so not really the best time to paint - not much light and not really the best drying time possible. Today they came a little bit earlier 4ish and apparently coming back tomorrow to finish. I hate this piecemeal work because that's what the end result looks like piecemeal.

To top it off I think whoever has done the replastering has chipped the caesarstone in the bathroom - not happy Jan not sure how they fix this...they probably have to replace the whole thing??

I think the tiler will have to come back also as I noticed the mosaic tiles were coming off in the powder room - not sure what happened to the tiler here as I thought they'd done a good job in the bathrooms and ground floor despite all the tile sagas we've had; have not fully checked the tiling at all.

We seem so close to the end but there are still so much stuff outstanding.

Saturday, May 23, 2009

Did a bit retail therapy on Friday and went to Signature Prints, I was surprised to see that they had cushions, prints on canvas and pendant lights all on SALE so I bought these cushions to go with the chocolate lounge. They look pretty funky, I've not worked out exactly what look I'm trying to go for but I thought these looked cheerful and fun.

Thursday, May 21, 2009

Tuesday the temporary fence went down to my surprise, I was just told last Friday that this wasn't happening for another 2-3 weeks. No worries, I'm hoping EB would let us get started on our fencing, especially now we don't have one.

Lots of activity at the house yesterday the door fittings and bathroom accessories were installed, it was good I saw them before they put in the bathroom accessories so I was able to tell them where I wanted everything placed.

I would have preferred the door fittings go on last, after the paintings done. The touch ups will be getting done next week after the floors get sanded and the house gets cleaned. The painting looks very sloppy and have told EB that we weren't happy with it, so will wait and see what EB will do on this front.

The painters better cover up the floor tiles and benchtops before they start painting - will not be happy if they mess this up.

The bricks were also fixed on Wed finally; this was the first time I've seen a brick layer work in the rain.

No activity at the house on Thurs & Fri.

Monday, May 18, 2009

So exhausted from the weekend, we did the Relay for Life and raised almost $4k - I think this was a fantastic result considering we only had 4 weeks to raise money. I will be better organised next year.

The plumbers were in today installing the taps, toilets and bathtub.